top of page

Project

Air Support Operations Complex (ASOC), Wheeler Army Airfield

  • $10M Design-Build Project.

  • The project required historical renovation of administrative office spaces, constructions of weapons system/vehicle storage facility, and expanding the existing Privately-Owned Vehicle parking space.

  • Sustainable practices were involved in the project; sustainable transportation, reduced water consumption by 30%, high efficiency HVAC system, recycled material, and controllable energy systems.

 

bottom of page